Apollo Command/Service Module

In-active Human Rated Capsule Crew Capacity: 3 Payload Capacity: 1050 kg Diameter: 3.9 m Height: 11.0 m

()

Feb. 26, 1966

Cargo and Human Transportation to Lunar Orbit

Flight Life

14 days

Description

The Apollo Command/Service Module (CSM) was one of two principal components of the United States Apollo spacecraft, used for the Apollo program which landed astronauts on the Moon between 1969 and 1972. The CSM functioned as a mother ship which carried a crew of three astronauts and the second Apollo spacecraft, the Lunar Module, to lunar orbit, and brought the astronauts back to Earth. It consisted of two parts: the conical Command Module, a cabin that housed the crew and carried equipment needed for atmospheric reentry and splashdown; and the cylindrical Service Module which provided propulsion, electrical power and storage for various consumables required during a mission. An umbilical connection transferred power and consumables between the two modules. Just before reentry of the Command Module on the return home, the umbilical connection was severed and the Service Module was cast off and allowed to burn up in the atmosphere.

History

The Apollo Command/Service Module (CSM) was one of two principal components of the United States Apollo spacecraft, used for the Apollo program which landed astronauts on the Moon between 1969 and 1972.



Falcon 9
Success
2 days ago
Starlink Group 6-104
Space Launch Complex 40 - Cape Canaveral SFS, FL, USA

A batch of 28 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.


Falcon 9
Success
2 days, 18 hours ago
Starlink Group 17-25
Space Launch Complex 4E - Vandenberg SFB, CA, USA

A batch of 25 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.


Falcon 9
Success
4 days, 2 hours ago
Starlink Group 10-36
Space Launch Complex 40 - Cape Canaveral SFS, FL, USA

A batch of 29 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system. First Starlink laun…


Falcon 9
Success
1 week ago
Starlink Group 6-103
Space Launch Complex 40 - Cape Canaveral SFS, FL, USA

A batch of 29 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.


Falcon 9
Success
1 week, 2 days ago
Starlink Group 17-13
Space Launch Complex 4E - Vandenberg SFB, CA, USA

A batch of 24 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.


Falcon 9
Success
1 week, 3 days ago
Crew-12
Space Launch Complex 40 - Cape Canaveral SFS, FL, USA

SpaceX Crew-12 is the twelfth crewed operational flight of a Crew Dragon spacecraft to the International Space Station as part of NASA's Commercial C…


Ariane 64
Success
1 week, 4 days ago
Amazon Leo (LE-01)
Ariane Launch Area 4 - Guiana Space Centre, French Guiana

Amazon Leo, formerly known as Project Kuiper, is a mega constellation of satellites in Low Earth Orbit that will offer broadband internet access, thi…


Vulcan VC4S
Success
1 week, 4 days ago
USSF-87
Space Launch Complex 41 - Cape Canaveral SFS, FL, USA

USSF-87 will launch two identical Geosynchronous Space Situational Awareness Program (GSSAP) satellites GSSAP-7 and GSSAP-8 directly to a near-geosyn…


Proton-M
Success
1 week, 4 days ago
Elektro-L No.5
81/24 (81P) - Baikonur Cosmodrome, Republic of Kazakhstan

Elektro-L is a series of meteorological satellites developed for the Russian Federal Space Agency by NPO Lavochkin. They are designed to capture real…


Smart Dragon 3
Success
1 week, 4 days ago
PRSC-EO2 & 6 satellites
South China Sea (launch location 3) - Haiyang Oriental Spaceport

Carried 7 satellites to sun-synchronous orbit, including PRSC-EO2 (Earth observation satellite for the Pakistan government's SUPARCO) & CUHK-1. Detai…